Solutions

The following pictures show the process of drilling for, installing and grouting the Cintec ground anchors.  


Setting up the drilling rig
Setting up the drilling rig

 


The drilling head

 


Adding mining barrel extensions

 


Mining barrel extensions

 


Drill head at full depth

 


Inserting plastic tube liner to the drilled hole

 


Cintec anchor in its packing protects until needed

 


Removing anchor from the packing

 


Ready to insert anchor

 


Carefully placing the anchor

 


Making sure the sock is not bunched up at the end

 


Final few feet going in

 


Extracting the tube liner

 


Removing the tube liner

 


Grouting the anchor