Search CINTEC.COM:

Advanced Search

Verification of Structural Analysis :: Table of Contents :: Introduction :: Method :: Process :: Arch Strengthening :: ELFEN :: Full Scale Arch Tests
Unstrengthened Arches :: ARCHTEC Strengthened Arches :: Failure Behaviour :: Conclusions  :: References :: Appendix A :: Appendix B :: Appendix C

Report No. B1660A/V10/R03
August 2003
Cintec International
Cintec House
11 Goldtops
NEWPORT
NP20 4PH

APPENDIX A

TYPICAL CONVENTIONAL ARCH ANALYSIS RESULTS

Figure A.1 Archie Analysis - 5m Span TRL - Mortar Bonded Rings

 

Figure A.2 Archie-M Analysis - 5m Span TRL - Mortar Bonded Rings
(Corresponding tabular printout omitted)

 

Figure A.3 RING Analysis - 5m Span TRL - Mortar Bonded Rings

 

Cintec International

Cintec House
11 Goldtops
NEWPORT
NP20 4PH

Gifford And Partners Ltd

Carlton House
Ringwood Road
Woodlands
Southampton
SO40 7HT